Insights

Notes from the field on foundation delivery.

Technical perspectives drawn from our four mandates — owner's representation, piling construction consulting, estimating for contractors, and construction management — written for owners, EPCs, engineers, and contractors.

Constructability6 min read

ARTICLE 01

Why Foundation Constructability Reviews Should Begin During FEED

Coming soon →

Methodology7 min read

ARTICLE 02

Choosing a Piling Method Is More Than a Geotechnical Decision

Coming soon →

Risk5 min read

ARTICLE 03

Ten Foundation Risks to Resolve Before Tender

Coming soon →

Project Controls8 min read

ARTICLE 04

How Production Rates Affect Piling Costs and Schedules

Coming soon →

ECI6 min read

ARTICLE 05

What Owners Should Expect From Foundation ECI

Coming soon →

Procurement5 min read

ARTICLE 06

Is Your Piling Package Ready for Procurement?

Coming soon →

Site Logistics6 min read

ARTICLE 07

Working Platforms: A Critical Foundation-Construction Risk

Coming soon →

Execution7 min read

ARTICLE 08

Managing Refusal and Obstructions During Pile Installation

Coming soon →

Readiness5 min read

ARTICLE 09

Construction Readiness for Major Foundation Programs

Coming soon →

Scope Management6 min read

ARTICLE 10

Preventing Scope Gaps Between Piling and Concrete Contractors

Coming soon →

Field Reference

Conditions and methods behind the notes we publish.

Marine piling rig drilling a rock socket through casing on an over-water platform
Marine Infrastructure
Crew grouting a drilled foundation in winter conditions
Winter Works
Sheet-pile excavation with dewatering pumps in service
Shoring
Casing installation continuing at sunset on a frozen pad
Piling
Pipe pile hoisted into crane leads before driving
Piling

Foundation Certainty

Before the design is issued, the tender closes, or equipment mobilizes—make sure the foundation plan can be built.

Discuss Your Project →